$TEMA: SPREGNUTI MOST
$      NADVOZNJAK PREKO AUTOCESTE

+PROG AQUA M19000000 urs:1
HEAD POPRECNI PRESJECI
ECHO FULL EXTR
CTRL STYP    $control of computation;method of shear in solid section
NORM EC 4
STEE 1 S 355   $celicni nosac-glavni i poprecni
STEE 2 S 355   $WELD
CONC 12 TYPE C 40 gam=0  $betonska ploca u cs
CONC 13 TYPE C 40  $BETON ZA PLOCU - KAO POPRECNI NOSACI
STEE 4 S 500 $armatura betonske ploce

LET#DGP 20    $                          -----          -----
LET#SGP 400   $                            \              /
LET#RGP 800  $RAZMAK OSI GORNJEG POJASA     \            /
LET#SGP2 200   $                             \          /
LET#TGP  20    $                              \- - - - /
LET#RDP  550   $RAZMAK OSI DONJEG POJASA
LET#VS   1450  $VISINA SANDUKA
$LET#TH   12    $DEBLJINA HRPTA
$LET#TDP  40    $DEBLJINA DONJEG POJASA
LET#SBP  2.25   $SIRINA BETONSKOG POJASA
LET#TBP  0.25  $DEBLJINA BETONSKOG POJASA
LET#SBP1 1.25
LET#SBP2 0.2
LET#SBP3 0.6
#define popr_pr
CS 1
PLAT NO    YB           ZB    YE          ZE     T      MNO
     101   #RGP-#SGP2   0     #RGP        0     #TGP    1   $GORNJI POJAS (LIJEVO)
     102   #RGP         0     #RGP+#SGP2  0     #TGP    1   $GORNJI POJAS (LIJEVO)
     103   #RGP         0     #RDP        #VS   #TH     1   $LIJEVI HRBAT
     104   #RDP         #VS   #RDP+50     #VS   #TDP    1   $DONJI POJAS
     105   #RDP         #VS   -#RDP       #VS   #TDP    1   $DONJI POJAS
     106   -#RDP        #VS   -#RDP-50    #VS   #TDP    1   $DONJI POJAS
     107   -#RDP        #VS   -#RGP       0     #TH     1   $DESNI HRBAT
     108   -#RGP+#SGP2  0     -#RGP       0     #TGP    1   $GORNJI POJAS
     109   -#RGP        0     -#RGP-#SGP2 0     #TGP    1   $GORNJI POJAS
CS 2
PANE  NO     YB              ZB                          YE              ZE                           T      MNO
     201    #SBP            (-#TGP/(1000*2))-#TBP/2     #SBP-#SBP1     (-#TGP/(1000*2))-#TBP/2       #TBP   13
     206    -#SBP+#SBP1     (-#TGP/(1000*2))-#TBP/2     -#SBP          (-#TGP/(1000*2))-#TBP/2       #TBP   13
     202    #SBP-#SBP1      (-#TGP/(1000*2))-#TBP/2     #SBP3+#SBP2    (-#TGP/(1000*2))-#TBP/2       #TBP   13
     203    #SBP3+#SBP2     (-#TGP/(1000*2))-#TBP/2     #SBP3          (-#TGP/(1000*2))-#TBP/2       #TBP   13

     205    -#SBP3          (-#TGP/(1000*2))-#TBP/2     -#SBP3-#SBP2   (-#TGP/(1000*2))-#TBP/2       #TBP   13
     205    -#SBP3-#SBP2    (-#TGP/(1000*2))-#TBP/2     -#SBP+#SBP1    (-#TGP/(1000*2))-#TBP/2       #TBP   13

     204    #SBP3           (-#TGP/(1000*2))-#TBP/2     -#SBP3         (-#TGP/(1000*2))-#TBP/2       #TBP   13

WELD  NO     YB           ZB                                 YE              ZE     T      MNO
      301    #RGP         (-#TGP/2)-#TBP*1000/2       #RGP            0      20     2
      302    #RGP+#SGP2   (-#TGP/2)-#TBP*1000/2       #RGP+#SGP2      0      20     2
      303    #RGP-#SGP2   (-#TGP/2)-#TBP*1000/2       #RGP-#SGP2      0      20     2
      304   -#RGP         (-#TGP/2)-#TBP*1000/2      -#RGP            0      20     2
      305   -#RGP+#SGP2   (-#TGP/2)-#TBP*1000/2      -#RGP+#SGP2      0      20     2
      306   -#RGP-#SGP2   (-#TGP/2)-#TBP*1000/2      -#RGP-#SGP2      0      20     2
LRF  NO    YB         ZB                      YE          ZE                      LAY    MRF    TORS      AS     ASMA
     1     #SBP-0.05  -#TBP-(#DGP/2000)+0.05  -#SBP+0.05  -#TBP-(#DGP/2000)+0.05  M1      4     ACTI      75     200
     2     #SBP-0.05  -#TBP-(#DGP/2000)+0.2  -#SBP+0.05  -#TBP-(#DGP/2000)+0.2    M1      4     ACTI      75     200
#enddef

LET#s 1
LOOP 3
SECT #s TITL  "GLAVNI CELICNI NOSAC DO LEZAJA"
IF (#s==1); LET#TH   14 ; LET#TDP  20; ENDIF
IF (#s==2); LET#TH   14 ; LET#TDP  30; ENDIF
IF (#s==3); LET#TH   12 ; LET#TDP  40; ENDIF
#INCLUDE popr_pr
LET#s #s+1
ENDLOOP

SECT 4 TITL "POPRECNI NOSAC NA LEZAJU"
PLAT  NO    YB      ZB    YE      ZE     T      MNO
      101  -200      0     0       0     20      1
      102    0       0    200      0     20      1
      103    0       0     0      1450   12      1
      104  -200      1450  0      1450   20      1
      105   0        1450  200    1450   20      1

SECT 5 MNO 12 TITL  "POPRECNI BETONSKI NOSACI"
POLY O
VERT
101 2.50 0.00
102 2.50 0.25
103 -2.5 0.25
104 -2.5 0.00
CUT ZB S

lrf no    yb    zb      ye     ze      as     asma  lay  mrf   tors
    201   2.45  0.05   -2.45   0.05    94     250   m2    4    acti
    202   2.45   0.2    -2.45    0.2     94     250   m2    4    acti

SREC 6 H 1 B 1 SO 5 SU 5 MNO 13 MRF 4  $POMOCNI STUPOVI
END

+PROG AQUP urs:3
HEAD GRAFICKI PRIKAZ PRESJEKA
SIZE -4 SC 35 SPLI 2X1 AXIS POSZ
SECT 1 PICT,TEXT
SECT 2 PICT,TEXT
SECT 3 PICT,TEXT
SECT 4 PICT,TEXT
SECT 5 PICT,TEXT
END

+PROG GENF  m19000000 urs:235
HEAD MODEL NADVOZNJAKA
ECHO OPT FULL VAL YES
SYST TYPE SPAC OPTI NO

$cvorovi desnog glavnog nosaca
NODE 1 -0.7 2.05 0
     2  0.0 2.05 0 PPYM
     3  4.0 2.05 0
     4  5.0 2.05 0
     5  10.0 2.05 0
     6  15.0 2.05 0
     7  20.0 2.05 0
     8  25.0 2.05 0
     9  30.0 2.05 0
     10 35.0 2.05 0
     11  36.0 2.05 0
     12  40.0 2.05 0 XPYM
     13  40.7 2.05 0
     14  20.0 2.05 2 PP

$cvorovi lijevog glavnog nosaca
NODE 21 -0.7 -2.05 0
     22  0.0 -2.05 0 PPYM
     23  4.0 -2.05 0
     24  5.0 -2.05 0
     25  10.0 -2.05 0
     26  15.0 -2.05 0
     27  20.0 -2.05 0
     28  25.0 -2.05 0
     29  30.0 -2.05 0
     30  35.0 -2.05 0
     31  36.0 -2.05 0
     32  40.0 -2.05 0 XPYM
     33  40.7 -2.05 0
     34  20.0 -2.05 2 PP

$cvorovi poprecnih nosaca
NODE 50 0 2.05 0.553
     51 0 -2.05 0.553
     60 40 2.05 0.553
     61 40 -2.05 0.553


$cvorovi betonskih poprecnih nosaca VANJSKI
NODE 100  0   4.10  -0.432
NODE 108 40   4.10  -0.432
NODE 600  0  -4.10  -0.432
NODE 608 40  -4.10  -0.432
MESH 100 108 600 608 M 8 N 1

$cvorovi betonskih poprecnih nosaca VANJSKI NAD NOSACEM
NODE 200  0  2.85 -0.432
NODE 208 40  2.85 -0.432
NODE 500  0 -2.85 -0.432
NODE 508 40 -2.85 -0.432
MESH 200 208 500 508 M 8 N 1

$cvorovi betonskih poprecnih nosaca VANJSKI NAD NOSACEM
NODE 300  0  1.25 -0.432
NODE 308 40  1.25 -0.432
NODE 400  0 -1.25 -0.432
NODE 408 40 -1.25 -0.432
MESH 300 308 400 408 M 8 N 1

$fiksiranje cvorova poprecnih nosaca na glavni nosac
NODE 50 FIX KF NREF 2
NODE 51 FIX KF NREF 22
NODE 60 FIX KF NREF 12
NODE 61 FIX KF NREF 32

$fiksiranje cvorova betonskog poprecnog presjeka na glavni nosac
NODE 200 FIX KF NREF 2
NODE 201 FIX KF NREF 4
NODE 202 FIX KF NREF 5
NODE 203 FIX KF NREF 6
NODE 204 FIX KF NREF 7
NODE 205 FIX KF NREF 8
NODE 206 FIX KF NREF 9
NODE 207 FIX KF NREF 10
NODE 208 FIX KF NREF 12

NODE 300 FIX KF NREF 2
NODE 301 FIX KF NREF 4
NODE 302 FIX KF NREF 5
NODE 303 FIX KF NREF 6
NODE 304 FIX KF NREF 7
NODE 305 FIX KF NREF 8
NODE 306 FIX KF NREF 9
NODE 307 FIX KF NREF 10
NODE 308 FIX KF NREF 12

NODE 400 FIX KF NREF 22
NODE 401 FIX KF NREF 24
NODE 402 FIX KF NREF 25
NODE 403 FIX KF NREF 26
NODE 404 FIX KF NREF 27
NODE 405 FIX KF NREF 28
NODE 406 FIX KF NREF 29
NODE 407 FIX KF NREF 30
NODE 408 FIX KF NREF 32

NODE 500 FIX KF NREF 22
NODE 501 FIX KF NREF 24
NODE 502 FIX KF NREF 25
NODE 503 FIX KF NREF 26
NODE 504 FIX KF NREF 27
NODE 505 FIX KF NREF 28
NODE 506 FIX KF NREF 29
NODE 507 FIX KF NREF 30
NODE 508 FIX KF NREF 32

$desni glavni nosac
BEAM NO NA NE NCS DIV
1  1   2   1  1
2  2   3   1  5
3  3   4   2  5
4  4   5   2  5
5  5   6   3  5
6  6   7   3  5
7  7   8   3  5
8  8   9   3  5
9  9   10  2  5
10 10  11  2  5
11 11  12  1  5
12 12  13  1  1


$lijevi glavni nosac
BEAM NO NA NE NCS DIV
1001 21 22 1 1
1002 22 23 1 5
1003 23 24 2 5
1004 24 25 2 5
1005 25 26 3 5
1006 26 27 3 5
1007 27 28 3 5
1008 28 29 3 5
1009 29 30 2 5
1010 30 31 2 5
1011 31 32 1 5
1012 32 33 1 1

$POMOCNI STUPOVI
BEAM   NO    NA   NE   NCS    AHIN   EHIN                    $  N2    CP=10^10
       5001  7    14    6     MYMZ   MYMZ
       5002  27   34    6     MYMZ   MYMZ
$poprecni nosaci
BEAM NO NA NE NCS DIV
2001 50 51 4 3
2002 60 61 4 3

$porecni betonski nosaci
BEAM NO NA NE NCS
3000 100 200 5
3001 200 300 5
3002 300 400 5
3003 400 500 5
3004 500 600 5

3010 101 201 5
3011 201 301 5
3012 301 401 5
3013 401 501 5
3014 501 601 5

3020 102 202 5
3021 202 302 5
3022 302 402 5
3023 402 502 5
3024 502 602 5

3030 103 203 5
3031 203 303 5
3032 303 403 5
3033 403 503 5
3034 503 603 5

3040 104 204 5
3041 204 304 5
3042 304 404 5
3043 404 504 5
3044 504 604 5

3050 105 205 5
3051 205 305 5
3052 305 405 5
3053 405 505 5
3054 505 605 5

3060 106 206 5
3061 206 306 5
3062 306 406 5
3063 406 506 5
3064 506 606 5

3070 107 207 5
3071 207 307 5
3072 307 407 5
3073 407 507 5
3074 507 607 5

3080 108 208 5
3081 208 308 5
3082 308 408 5
3083 408 508 5
3084 508 608 5
END

+PROG GRAF urs:236
VIEW STAN 1 1 1  POSZ
SIZE HP4
STRU 1 1
STRU sno
END

+PROG SOFILOAD urs:929
HEAD DEFINICIJE DJELOVANJA

$ACT G   GAMU 1.35 GAMF 1.00  PSI0 1.00 PSI1 1.00 PSI2 1.00           TITL   'STALNO'                  $!!!!!!!!!!!!!!!!!!
ACT G_1 GAMU 1.35 GAMF 1.00  PSI0 1.00 PSI1 1.00 PSI2 1.00           TITL   'STUPOVI'                 $!!!!!!!!!!!!!!!!!!
ACT G_2 GAMU 1.35 GAMF 1.00  PSI0 1.00 PSI1 1.00 PSI2 1.00
ACT G_3 GAMU 1.35 GAMF 1.00  PSI0 1.00 PSI1 1.00 PSI2 1.00
$ACT P   GAMU 1.00 GAMF 1.00  PSI0 1.00 PSI1 1.00 PSI2 1.00           TITL   'PREDNAPINJANJE'          $!!!!!!!!!!!!!!!!!!
                                                              $ Prestress subsequent composite: DIN FB 102 II 2.5.4.2 (4)
                                                              $ In GZT: 1.00 ! DIN FB 102 II 2.5.4.2 (6)
                                                              $ (ING-BAY-Zilch-S.21)
$ACT ZS  GAMU 1.00 1 SUP PERM PSI0 1.00 PSI1 1.00 PSI2 1.00           TITL   'Stat.indeterminate Prestressing'
    $ At the moment still ZS, as ZP not yet possible (AQB)
ACT C   GAMU 1.00 0 SUP PERM PSI0 1.00 PSI1 1.00 PSI2 1.00           TITL   'S&P'                     $!!!!!!!!!!!!!!!!!!

ACT L_T GAMU 1.50 0 SUP EXCL PSI0 0.75 PSI1 0.75 PSI2 0.20 PS1S 0.80 TITL   'PROMET VOZILA'           $!!!!!!!!!!!!!!!!!!
ACT L_U GAMU 1.50 0 SUP COND PSI0 0.40 PSI1 0.40 PSI2 0.20 PS1S 0.80 TITL   'PROMET KONTINUIRANO'     $!!!!!!!!!!!!!!!!!!

$ACT L_T GAMU 1 0 SUP EXCL PSI0 1 1 1 1 TITL   'PROMET VOZILA'           $!!!!!!!!!!!!!!!!!!
$ACT L_U GAMU 1 0 SUP COND PSI0 1 1 1 1 TITL   'PROMET KONTINUIRANO'     $!!!!!!!!!!!!!!!!!!

ACT L_1 GAMU 1.50 0 SUP excl PSI0 0.40 PSI1 0.40 PSI2 0.20 PS1S 0.80 TITL   'Kocna sila'
$ Here SUP COND=Special case, as L_U is used in AQB without intermediate SUPPrposition!
$ compare Dreifeld_fachb.dat - there the intermediate SUPPrposition is applied !
                                                              $ (ING-BAY-Buba-P.14 + ING-BAY-Hennecke-P.8)
$ACT SF  GAMU 1.00 0 SUP EXCL PSI0 1 1 1 1                            TITL   'Possible Settlement'
$ACT ZF  GAMU 1.00 0 SUP EXCL PSI0 1 1 1 1                            TITL   'Real Settlement'
ACT ZW  GAMU 1.50 0 SUP EXCL PSI0 0.30 PSI1 0.50 PSI2 0.00 PS1S 0.60 TITL   'VJETAR OPT'                  $!!!!!!!!!!!!!!!!!!
ACT SW  GAMU 1.50 0 SUP EXCL PSI0 0.30 PSI1 0.50 PSI2 0.00 PS1S 0.60 TITL   'VJETAR NEOPT'                  $!!!!!!!!!!!!!!!!!!
ACT T   GAMU 1.50 0 SUP EXCL PSI0 0.80 PSI1 0.60 PSI2 0.50 PS1S 0.80 TITL   'TEMPERATURA'             $!!!!!!!!!!!!!!!!!!
ACT B   GAMU 1.35 1 SUP PERM PSI0 1 1 1                              TITL   'State during construction'
ACT X   GAMU 1.00 GAMF 1.00  PSI0 1 1 1                              TITL   'Single Load Cases'
ACT E   GAMU 1.0 GAMF 0 PART E SUP USEX                              TITL   'Earthquake'

$ The specification SUP PERM,COND,EXCL is important goes depending on
$ the definition of the traffic load cases:
$    SUP EXCL - only one of the load cases will be taken
$    SUP CONC - the available load cases will all be taken, if infavourable effects
                      $ Meaning of the PSI-Values:
                      $
                      $ Fraction :(1.00*Q-Leit + PSI0*Qki)*GAMU-GAMF
                      $
                      $ Seldom: 1.00*Q-Leit + PSI0*Qki
                      $ Often: PSI1*Q-Leit + PSI2*Qki
                      $ Quasi : PSI2*Q-Leit + PSI2*Qki  =    PSI2*Q-any
                      $ Noth: PSI1*Q-Leit + PSI1*Qki
                      $
                      $ According to : (ING-BAY-Buba-S.15)
                      $ see also MAXIMA - Theoretical basis
$ G should the generic term effects G the sub effects
$ G_1 and G_2 together! L also sums up L_U plus L_T!
$ But not Z the ZF and ZS, as an underscore doesn't foolow!
END

+PROG SOFILOAD urs:928
HEAD UKLANJANJE PRIVREMENOG STUPA
ECHO FULL FULL
GRP 0,1,2,3
LC 3 TYPE G_2 TITL 'UKLANJANJE PRIVR. STUPA'
NODE 7 TYPE=PZ  P1 21.88
NODE 27 TYPE=PZ  P1 21.88
END
+prog ASE urs:926
head UKLANJANJE PRIVR. STUPA
echo full FULL
GRP 0,1,2,3
LC 3 TYPE G_2
END

+PROG SOFILOAD urs:930
HEAD DODATNO STALNO
ECHO FULL FULL
GRP 0,1,2,3
LC 4 TYPE G_3 TITL 'DODATNO STALNO'
BEAM GRP 0 TYPE=PZ  PA 21.88
BEAM GRP 1 TYPE=PZ  PA 21.88
END
+prog ASE urs:931
head DODATNO STALNO
echo full FULL
GRP 0,1,2,3
LC 4 TYPE G_3
END

+PROG CSM urs:924
HEAD  FAZE IZVEDBE
CTRL DL  AUTO   $ Deadload applied automatically
$ ECHO CREP 90 $ default is ECHO KRIP 245 ! shows the development of the
               $ construction stages in a good overview in the .erg file
$
CS 1   TYPE G_1 TITL   'MONTAZA CELIKA I POM_STUPA'

CS 2   TYPE G_2 TITL   'BETONIRANJE PLOCE'
CS 3   TYPE B   TITL   'OCVRSCAVANJE PLOCE'
CS 4   TYPE C_1 TITL   'S&P - 7 DANA'  T 7 RH 80
CS 5   TYPE G_2 TITL   'UKLANJANJE PRIVR. STUPA'

CS 6   TYPE G_3 TITL   'DODATNO STALNO'
CS 7   TYPE C_2 TITL   'S&P - 100 DANA'  T 100 RH 80



GRP  NO           ICS1 ICSD ATIL HFIX SITU T0 TITL
      (0,1,2)       1    -    -    -    -   -  'UZDUZNI NOSACI'

         5          1    -    4    -    -   -  'POMOCNI STUP'
         3          3    -    -    -    -   -  'SPREZANJE'

LC    NO    TYPE  ICS1 ATIL
      3      G_2   5    -
      4      G_3   6    -

END
+apply $(NAME)_csm.dat

+PROG SOFILOAD urs:5
HEAD VJETAR
ECHO FULL FULL
GRP 5 OFF
LC 14 DLZ 0 TYPE SW TITL 'VJETAR NEOPTERECEN MOST'
BEAM GRP 0 TYPE=PY  PA=1.23
BEAM GRP 0 TYPE=MX  PA=0.56
lc 15 DLZ 0 TYPE ZW titl 'VJETAR OPTERECEN MOST'
BEAM GRP 0 TYPE=PY  PA=2.77
BEAM GRP 0 TYPE=MX  PA=0.30
END

+PROG ASE urs:910
HEAD RACUN ZA VJETAR NEOPT
echo full FULL
syst prob line $th2
GRP 5 OFF
LC 14
LC 15
END

+PROG SOFILOAD urs:239
HEAD TEMPERATURA
ECHO FULL FULL
LC 16 DLZ 0 TYPE T TITL "jednoliko zagrijavanje"
BEAM grp 0 TYPE=TEMP PA=32
BEAM grp 1 TYPE=TEMP PA=32
BEAM grp 2 TYPE=TEMP PA=32

LC 17 DLZ 0 TYPE T TITL "jednoliko hladenje"
BEAM grp 0 TYPE=TEMP PA=-22
BEAM grp 1 TYPE=TEMP PA=-22
BEAM grp 2 TYPE=TEMP PA=-22

LC 18 DLZ 0 TYPE T TITL "nejednolika temperatura - pozitivna razlika"
BEAM grp 0 TYPE=DTZ PA=-15
BEAM grp 1 TYPE=DTZ PA=-15
BEAM grp 2 TYPE=DTZ PA=-15

LC 19 DLZ 0 TYPE T TITL "nejednolika temperatura - pozitivna razlika"
BEAM grp 0 TYPE=DTZ PA=18
BEAM grp 1 TYPE=DTZ PA=18
BEAM grp 2 TYPE=DTZ PA=18

LC 30 DLZ 0 TYPE X TITL "jednoliko zagrijavanje - za pomake"
BEAM grp 0 TYPE=TEMP PA=52
BEAM grp 1 TYPE=TEMP PA=52
BEAM grp 2 TYPE=TEMP PA=52

LC 31 DLZ 0 TYPE X TITL "jednoliko hladenje - za pomake"
BEAM grp 0 TYPE=TEMP PA=-42
BEAM grp 1 TYPE=TEMP PA=-42
BEAM grp 2 TYPE=TEMP PA=-42
END

+PROG star2 urs:932
HEAD KOMBINACIJE TEMPERATURE
echo full FULL
ctrl I
LC 41  titl  'Temp. kombinacija 1' TYPE T
 lcc 16 1.0
 lcc 18 0.75
LC 42  titl  'Temp. kombinacija 2' TYPE T
 lcc 16 1.0
 lcc 19 0.75
LC 43  titl  'Temp. kombinacija 3' TYPE T
 lcc 17 1.0
 lcc 18 0.75
LC 44  titl  'Temp. kombinacija 4' TYPE T
 lcc 17 1.0
 lcc 19 0.75

LC 45  titl  'Temp. kombinacija 11' TYPE T
 lcc 16 0.35
 lcc 18 1.00
LC 46  titl  'Temp. kombinacija 12' TYPE T
 lcc 16 0.35
 lcc 19 1.00
LC 47  titl  'Temp. kombinacija 13' TYPE T
 lcc 17 0.35
 lcc 18 1.00
LC 48  titl  'Temp. kombinacija 14' TYPE T
 lcc 17 0.35
 lcc 19 1.00
END


+PROG ELSE  m19000000 urs:240
head PROMETNO - KONTINUIRANO
echo type full val yes
ctrl opt sect 1

lgeo no   s    x       y      z
     1    1  0.00     2.05   0.0
     1    2  40.00    2.05   0.0
     2    1  0.00    -0.95   0.0
     2    2  40.00   -0.95   0.0
     3    1  0.00    -3.475  0.0
     3    2  40.00   -3.475  0.0
     4    1  0.00     4.025  0.0
     4    2  40.00    4.025  0.0

lsel no 1 int 2
lsel no 2 int 2
lsel no 3 int 2
lsel no 4 int 2

CALC TYPE MY LMAX 101 LMIN 102  SYST SPAC
CALC TYPE VZ LMAX 103 LMIN 104  SYST SPAC
CALC TYPE N  LMAX 105 LMIN 106  SYST SPAC

CASE 1 LCS 0 PSI0 0.40 PSI1 0.40 PSI2 0.20 PS1S 0.80 GAM1 1.35 GAM2 0.0

LANE 1 yrb 1.5 ylb -1.5
POSL 1 EVAL 0
TYPL 1 TYPE CONS FACZ 1. P5 0
bloa P 9.0

LANE 2 yrb 1.5 ylb -1.5
POSL 2 EVAL 0
TYPL 2 TYPE CONS FACZ 1. P5 0
bloa P 2.5

LANE 3 yrb 1.025 ylb -1.025
POSL 3 EVAL 0
TYPL 3 TYPE CONS FACZ 1. P5 0
bloa P 2.5

LANE 4 yrb 0.6 ylb -0.6
POSL 4 EVAL 0
TYPL 4 TYPE CONS FACZ 1. P5 0
bloa P 2.5
END

+PROG ELSE  m19000000 urs:933
head PROMETNO - u kombinaciji
echo type full val yes
ctrl opt sect 1

lgeo no   s    x       y      z
     1    1  0.00     2.05   0.0
     1    2  40.00    2.05   0.0
     2    1  0.00    -0.95   0.0
     2    2  40.00   -0.95   0.0
lsel no 1 int 2
lsel no 2 int 2
CALC TYPE MY LMAX 201 LMIN 202  SYST SPAC
CALC TYPE VZ LMAX 203 LMIN 204  SYST SPAC
CALC TYPE N  LMAX 205 LMIN 206  SYST SPAC

CASE 40
POSL 1  YEX 0
LANE 1 $YRB 1.5 YLB -1.5 PHIB 1
TYPL 1 Lm1 P1 240 P2 0 P3 0. P4 0. P5 0 P6 0. P8 0.

CASE 41
POSL 2  YEX 0
LANE 2 $YRB 1.5 YLB -1.5 PHIB 1.0
TYPL 2 Lm1 P1 160 P2 0 P3 0. P4 0. P5 0.0 P6 0. P8 0.
END

+PROG CSM urs:950
HEAD Bemessung nach DIN Fachberichten
ACT  TYPE FOR  $ Definition der zusätzlichen Einwirkungen:
     L_U CODE  $ fuer GZG und GZT- Nachweise
     L_T CODE  $ fuer GZG und GZT- Nachweise
    $L_1 CODE $ KOCNA SILA
    $W   ALL  $ VJETAR   NEOPTERECENI MOST
     ZW  CODE $ VJETAR OPTERECENI MOST
     SW  CODE $ VJETAR NA NEOPTERECENI MOST
    $B   ALL  $ KRLETKA
     T   CODE $ Zum Ansatz der Temperatur im Bruchzustand siehe DIN_FB_SOFiSTiK.doc
    $ZF  SLS  $ wahrscheinliche Setzung nur für die Gebrauchsnachweise
    $SF  ULS    $ mögliche Setzung nur für die Tragfähigkeitsnachweise
     $E   CODE
  DESI STAN       $ alle üblichen Nachweise (ohne ACCI accidential)

                $ manuell schaltbare Nachweise mit Zusatzparametern siehe Handbuch

$ desi sigb
END
+apply $(NAME)_desi_1.dat



+PROG ASE URS:951
CTRL MFIX
HEAD Vlastite vrijednosti
GRP 5 OFF
MASS fact 1 1 1  $ Ohne Decken-Vertikalschwingungen (no z masses)
MASS LC 3 PRZ 100
$ (kann mit Gesamtlastvektor-Darstellung des Lastfalles (2 und 3)
$ in WING kontrolliert werden)
$----------------------------------------------------------------------------------------------------
$ Converts PZ-loads of load case 2+3 into masses (imposed loads reduced)
$ (can be checked with WING by plotting the total nodal loadvector of loadcase 92)
$----------------------------------------------------------------------------------------------------
EIGE 50 LC 8301
END

+PROG SOFILOAD URS:952
HEAD 'Zadavanje spektra'
GRP 5 OFF
LC 21 TYPE E
RESP EC-1 CLAS C    $ EC8-Bemessungsspektrum
ACCE AX 2.943    $ Horizontale Bodenbeschleunigung in m/s²
END
LC 22 TYPE E
RESP EC-1 CLAS C    $ EC8-Bemessungsspektrum
ACCE AY 2.943    $ Horizontale Bodenbeschleunigung in m/s²
END
LC 23 TYPE E
RESP EC-1 CLAS C   $ EC8-Bemessungsspektrum
ACCE AZ 2.649    $ Horizontale Bodenbeschleunigung in m/s²
END ; END


+PROG DYNA URS:934
HEAD Berechnung der Antwortspektren
$ HEAD Analyis response spectra
EIGE NEIG 50 TYPE REST LC 8301
CTRL STYP 3
GRP 5 OFF
LC  21      $ Lastfall 11 und 12 werden hierbei kombiniert
LC  22
LC  23
$ Die Erdbebenrichtungen X und Y werden im
$ Beispiel erdbeben_jb.dat nur einfach kombiniert.
$
$ Im Gegensatz dazu wird im Beispiel erdbeben_jb_schief.dat
$ z.B. Erdbeben in X- plus 30 % Erdbeben in Y- addiert!

EXTR N  MAX 9701  ACT E
EXTR MY MAX 9702  ACT E
EXTR MZ MAX 9703  ACT E
EXTR MT MAX 9704  ACT E
EXTR VY MAX 9705  ACT E
EXTR VZ MAX 9706  ACT E
EXTR P  MAX 9707  ACT E
EXTR U,V,A 9708   ACT E
END












